ALFRED | |
Country: | Romania |
Location: | Mioveni |
Status: | Planned |
Cost: | EUR 1.0 billion |
Operator: | ICN |
Ps Units Planned: | 1 |
Np Reactor Type: | Lead-cooled fast reactor |
Ps Electrical Capacity: | 125 MW |
ALFRED (Advanced Lead-cooled Fast Reactor European Demonstrator) is a planned lead-cooled fast reactor. Designed by Ansaldo Energia from Italy, it represents the last stage of the ELSY and LEADER projects.[1] [2]
ALFRED will be built in the Romanian town of Mioveni near Pitesti.[3]