ACE Moharram Bakhoum explained

ACE Moharram Bakhoum
Type:Privately held company
Industry:Engineering
Founder:Ahmed Moharram and Michel Bakhoum
Hq Location Country:Egypt
Num Locations:Branches in 10 countries
Area Served:Worldwide (37 countries)
Services:Engineering and Project Management
Num Employees:2,300
Homepage:http://www.ace-mb.com/

ACE Moharram Bakhoum is a multi-disciplinary engineering and project management consultancy company, based in Egypt.[1]

Operations

The company operates in 37 countries, working on both private and publicly financed projects.[1]

History

ACE Moharram Bakhoum was established in 1950 as a private partnership between Ahmed Moharram and Michel Bakhoum.[2] The first projects executed by the partners was a storage area for printing machines constructed in the basement of a building in Cairo, followed by the design of a pharmacological factory. In the 1950s, the partners made their entry into the field of bridge design, for which they later became widely known.[3] By the 1970s, the company witnessed a regional expansion. In 1970, the first phase of the 6th of October Bridge was opened.[4] This bridge, which is considered the main artery of the Egyptian capital, was the first prestressed concrete bridge to be entirely designed, constructed and the construction supervised by Egyptian firms.[5] ACE Moharram Bakhoum was the designer and construction supervisor.[6] By this time, ACE had been involved in numerous high-profile projects in Egypt and the Middle East region, and the expansion of its activities to include other disciplines was necessary.[6] [3] Currently, ACE Moharram Bakhoum is one of the largest engineering offices in Egypt.[7] In 2020, ACE Moharram Bakhoum won the International Project of the Year Award by MEED for the Rod El Farag Cable Stayed Bridge, over the River Nile.[8]

Completed Projects

Examples of significant projects designed, managed, or supervised by ACE Moharram Bakhoum:

References

Founder & Managing Director ACE Moharram Bakhoum Group

Notes and References

  1. Web site: 2009-12-21. ACE sees more opportunities in development. 5 February 2021. Daily News Egypt. en-US.
  2. Web site: StackPath. 2021-02-05. dailynewsegypt.com.
  3. Web site: ACE Moharram.Bakhoum – Engineering global solutions. 2020-07-05. en-GB.
  4. Web site: كوبري 6 أكتوبر الشهير في العاصمة المصرية يرتدي حلة جديدة. 2020-07-05. الشرق الأوسط. ar.
  5. Web site: 2018-01-12. صور.. "كوبرى أكتوبر.. حدوتة مصرية".. السائقون: الكوبرى سبب ارتفاع نسبة الطلاق بمصر.. ولو رجع الزمن ماكناش اشتغلنا الشغلانة دى.. بائع الجرائد: "الإنترنت قتل مهنتنا" وبعت زمان لمحمود المليجى ودلوقتى محدش بيشترى. 2020-07-05. اليوم السابع.
  6. Web site: 2017-12-15. ميشيل باخوم.. "مهندس" جلسات الغرام في منطقة الدقي. 2020-07-05. صوت الأمة.
  7. Web site: StackPath. 2021-02-05. dailynewsegypt.com.
  8. Web site: 2020 National Winners and Finalists – MEED Project Awards. 2021-02-05. en-GB.
  9. Web site: 6th of October Bridge . structurae.net . 5 February 2021.
  10. Web site: محفوظ" الأمين المساعد للشئون البرلمانية لحزب " مستقبل وطن " و "المكتب الاستشاري الفرنسي" شركة (سيسترا- محرم – باخوم) يعاينان مدخط مترو الانفاق إلي قليوب/الخبر. Ibrahim. Samia. الخبر. ar. 2020-03-02.
  11. Web site: محور روض الفرج "كوبرى تحيا مصر" المقاولون العرب. arabcont.com. 2020-03-02.
  12. Web site: Rod El-Farag Axis Bridge in Egypt receives Guinness World Record title. Middle East Architect. en. 2020-03-02.
  13. Web site: ACE sees more opportunities in development - Daily News Egypt . 2020-03-02 . 2020-03-02 . https://web.archive.org/web/20200302193334/https://eklutdvotyzsri.dailynewssegypt.com/2009/12/21/ace-sees-more-opportunities-in-development/ . dead .