ABIBA Solar Power Station explained

ABIBA Solar Power Station
Country:Nigeria
Coordinates:10.5042°N 7.1781°W
Location:Kaduna, Kaduna State
Status:P
Cost:US$91.25 million
Owner:Abiba Solar Consortium
Operator:Abiba Solar Consortium
Solar Type:PV
Ps Site Area:150ha
Ps Electrical Capacity:50MW
Ps Annual Generation:82.5 GWh

The ABIBA Solar Power Station, also Abiba Solar Farm, is a planned 50MW solar power plant in Nigeria. The solar farm is under development by a consortium comprising Nigerian and European independent power producers (IPPs), and finance and investment firms. The off-taker of the electricity generated here is Nigerian Bulk Electricity Plc, for integration of the energy into the Nigeran electricity grid. An existing long-term power purchase agreement (PPA) governs the terms of sale and purchase of electricity between the sellers and buyers.[1]

Location

The power station would be located in the city of Kaduna, in Kaduna State, in northern Nigeria. Kaduna City is located about 221km (137miles), north of Abuja, Nigeria's capital city.

Overview

The power station is a ground-mounted solar park. The design calls for maximum generation capacity of 50 MW. Annual generation is calculated at 82.5 GWh, to be sold to the Nigerian Bulk Electricity Trading Plc, for integration into the Nigerian grid. The energy is estimated to be adequate to supply 200,000 Nigerian households.[1]

Work involves the laying of solar panels, installation of generators, transformers, inverters and connecting electrical cables to the new onsite substation. New high voltage transmission lines will be laid to transmit the power from the solar farm to a place where the electricity will be injected into the national grid.[2]

Ownership

The table below, illustrates the shareholding in the power station, as of January 2022.[1]

Rank !!Shareholder
Domicile Percentage Notes
1Access Infra Africa
2
3Access Quaint Solar Nigeria Limited [3]

Construction

As of January 2022, the power station was reported to be in the "permitting stage", with construction expected to begin later the same year. The cost of construction is reported to be approximately US$91.25 million.[1]

See also

External links

Notes and References

  1. Web site: ABIBA Solar PV Park, Nigeria . 25 January 2022 . Carmen . 8 July 2022 . New York City.
  2. Web site: Access/Quaint – Abiba Solar Power Plant 50 MW – Kaduna State, Nigeria . 6 October 2017 . GobalData.com . 8 July 2022 . GlobalData . London, United Kingdom.
  3. Web site: InfraCo Africa to co-finance a 50MWp solar PV plant in northern Nigeria . Anfracoafrica.com . 20 April 2017 . Infraco Africa . 8 July 2022 . London, United Kingdom.