900 Biscayne Bay | |
Parking: | 800 Spaces |
Location: | 900 Biscayne Boulevard, Miami, Florida, United States |
Architectural: | 650abbr=onNaNabbr=on[1] |
Floor Count: | 63 |
Elevator Count: | 13 |
Building Type: | Residential |
Start Date: | 2005 |
Completion Date: | 2008 |
Opening: | 2008 |
Architect: | Revuelta Vega Leon |
Developer: | Terra-Adi International Developments |
Structural Engineer: | DeSimone Consulting Engineers |
900 Biscayne Bay is a skyscraper in Miami, Florida, United States. It is located in northeastern Downtown Miami, on Biscayne Bay along the west side of Biscayne Boulevard. It opened for residential occupancy in early 2008. The tower is 650feet tall and has 63 floors. The building stands as the 7th-tallest building in Miami and in the state of Florida, behind Four Seasons Hotel Miami, Southeast Financial Center and Marquis Miami. It also stands as tallest all-residential building in the City and the State. 900 Biscayne Bay is located across the street from Ten Museum Park, another Miami residential high-rise, near Museum Park and American Airlines Arena in northern Biscayne Boulevard. It is also adjacent to the Park West Metromover station. Originally planned to rise 712feet and 65 floors, the Building went through a height reduction during its construction, with a decorative rooftop spire and two floors being removed from the final plans.
The 1500000square feet tower has 516 residential condominiums and 800 parking spaces. There are eleven typical units on each of the lower floors, with two-level townhomes and penthouses on the uppermost floors. The bottom three floors consist of a three-story lobby, retail shops, restaurant, and an outdoor café. The three storey main lobby is located 18feet above the ground and there is a separate porte cochere entrance and lobby for the offices.
Post-tensioned slabs with concrete shear walls and columns (up to 12 ksi strength) comprised the primary structure; other aspects for the project required innovative and creative analysis (e.g., site settlement during construction, creep/shortening analysis of vertical members and effects on slab levelness.) The primary structural design for the project was performed in less than 3 months in order to meet overall project scheduling needs.