86th Street station (Second Avenue Subway) explained

86 Street
Accessible:yes
Address:86th Street & Second Avenue
New York, New York
Borough:Manhattan
Locale:Upper East Side, Yorkville
Coordinates:40.7779°N -73.9518°W
Division:IND
Line:IND Second Avenue Line
Service:Second
Service Header:Second header
Connection: NYCT Bus:
NYC Ferry: Soundview route (at East 90th Street and East End Avenue)
Platforms:1 island platform
Tracks:2
Structure:Underground

The 86th Street station is a station on the first phase of the Second Avenue Line of the New York City Subway. Located at the intersection of Second Avenue and 86th Street, in the Yorkville section of the Upper East Side in Manhattan, it opened on January 1, 2017. The station is served by the Q train at all times, limited rush hour N trains, and one northbound A.M. rush hour R train. There are two tracks and an island platform.

The station was part of the original Second Avenue Subway as outlined in the Program for Action in 1968. Construction on that project started in 1972, but stalled in 1975 due to lack of funding. In 2007, a separate measure authorized a first phase of the Second Avenue Line to be built between 65th and 105th Streets, with stations at 72nd, 86th, and 96th Streets. The station opened on January 1, 2017, as an intermediate station along Phase 1. Since opening, the presence of the Second Avenue Subway's three Phase 1 stations has improved real estate prices along the corridor. The 86th Street station was used by approximately 8.4 million passengers in 2019.

The station, along with the other Phase 1 stations along the Second Avenue Subway, contains features not found in most New York City Subway stations. It is fully compliant with the Americans with Disabilities Act of 1990, containing two elevators for disabled access. Additionally, the station contains air conditioning and is waterproofed, a feature only found in newer stations. The artwork at 86th Street is Subway Portraits, a selection of twelve face portraits by painter Chuck Close.

History

Background

The Second Avenue Line was originally proposed in 1919 as part of a massive expansion of what would become the Independent Subway System (IND).[1] Work on the line never commenced, as the Great Depression crushed the economy.[2] Numerous plans for the Second Avenue Subway appeared throughout the 20th century, but these were usually deferred due to lack of funds. In anticipation of the never-built new subway line, the Second and Third Avenue elevated lines were demolished in 1942 and 1955, respectively.[3] [4] The Second Avenue Elevated had one station at 86th Street and Second Avenue—right above the same intersection where the subway station is located[5] —while the Third Avenue Elevated had two stops on nearby Third Avenue at 84th Street and 89th Street.[6]

Unrealized proposals

The Metropolitan Transportation Authority proposed a full-length Second Avenue Subway as part of its 1968 Program for Action. The line was to be built in two phases—the first phase from 126th to 34th Streets, the second phase from 34th to Whitehall Streets.[7] [8] The line's planned stops in Manhattan, spaced farther apart than those on existing subway lines, proved controversial; the Second Avenue line was criticized as a "rich man's express, circumventing the Lower East Side with its complexes of high-rise low- and middle-income housing and slums in favor of a silk stocking route." There was to be a station at 86th Street, but the next station north would be at 106th Street and the next station south would be at 57th Street.[9] In a planning report, a possible 86th Street station had already been confirmed.[10]

All Second Avenue Subway stations built under the Program for Action would have included escalators, high intensity lighting, improved audio systems, platform edge strips, and non-slip floors to accommodate the needs of the elderly and people with disabilities, but no elevators. Space at each station would have been used for ancillary facilities.[11] The stations were to be made with brick walls and pavers alongside stainless steel, and would have relatively small dimensions, with 10abbr=NaNabbr= mezzanine ceilings. Gruzen & Partners received a contract for the design of the 86th Street station.

A combination of Federal and State funding was obtained, and despite the controversy over the number of stops and route, a groundbreaking ceremony was held on October 27, 1972 at Second Avenue and 103rd Street.[12] [13] Although work on the 86th Street station never commenced, three short segments of tunnel in East Harlem and Chinatown were built.[14] [15] However, the city soon experienced its most dire fiscal crisis yet, due to the stagnant economy of the early 1970s, combined with the massive outflow of city residents to the suburbs, and in September 1975, construction on the line stopped, and the tunnels were sealed.[13] [16]

In 1999, the Regional Plan Association considered a full-length Second Avenue Subway, which include 86th Street as one of its planned 31 stations. The main station entrance would be at 86th Street to the north, with additional exits between 86th and 82nd Streets to the south.[17]

Construction

In March 2007, plans for the construction of the Second Avenue Subway were revived.[18] [19] The line's first phase, the "first major expansion" to the New York City Subway in more than a half-century,[20] included three stations in total (at 72nd, 86th, and 96th Streets), which collectively cost $4.45 to $4.5 billion.[21] [22] Its construction site was designated as being from 105th Street and Second Avenue to 63rd Street and Third Avenue.[23] The MTA awarded a $337 million contract—one that included constructing the tunnels between 92nd and 63rd Streets, building a launch box for the tunnel boring machine (TBM) at 92nd to 95th Streets, and erecting access shafts at 69th and 72nd Streets—to Schiavone Construction, Skanska USA Civil, and J.F. Shea Construction.[24] The line's construction commenced on April 15, 2007,[25] though planning for the station was finalized in June 2007,[26] when the station entrances' locations were confirmed.[27]

On September 15, 2011, the contract for building the station was awarded to the joint venture of Skanska USA and Traylor Bros Inc.[28] [29] [30], the cavern stretching from 83rd to 87th Streets was 57% excavated.[31] By July 2013, construction of the station was 53% complete.[32] The final blast for the 86th Street station was completed for an escalator cavern on November 22, 2013. Skanska/Traylor were still installing waterproofing and steel reinforcement, as well as putting concrete around the cavern, entrances, and ancillaries.[33], entrances 1 and 2 were being built, and excavation was 100% complete;, the station shell was complete, bringing the total Second Avenue Subway project progress to three-fourths completion.[34] [35] [36]

The station was scheduled to be completed by May 16, 2016,[37] but the estimated completion date was pushed back to October 2016.[38] [39] In October 2016, concerns arose that the station might not open on time because workers had only installed 10 of the station's 13 escalators.[40] However, the 86th Street station passed all required systems testing by December 18, 2016. The station opened on January 1, 2017.[41] [42]

Station layout

GroundStreet levelExits/entrances
Basement 1Upper landingNorth entrance escalator landing
Basement 2Lower MezzanineFare control, station agent, MetroCard machines
Basement 3
Platform level
Southbound← toward via Brighton
← toward Coney Island–Stillwell Avenue via Sea Beach (select rush hour trips) (72nd Street)
Island platform, doors will open on the left
Northbound toward (Terminus)
toward 96th Street (select rush hour trips) (Terminus)
toward 96th Street (one AM rush hour trip) (Terminus)
The 86th Street station is served by Q trains at all times, some N trains during rush hours, and one northbound R train during the AM rush hours.[43] The station is between 96th Street to the north and 72nd Street to the south. It has two tracks and an island platform.[44] The station is built so that it is more wide open than most other underground stations in the system;[45] its architecture, along with two other Second Avenue Subway stations, was compared to a Washington Metro station by Michael Horodniceanu, President of MTA Capital Construction.[46] The platform is 93 feet (28 m) below ground.[47] The platform for the 86th Street station, like the other Second Avenue Subway stations, is 27.8feet wide.[48] [49] As with other stations on the first phase of the Second Avenue Subway, it was designed and engineered by a joint venture of Arup and AECOM.[50]

The station has air-cooling systems to make it at least 10F-change cooler than other subway stations during the summer.[51] This requires the station to have large ventilation and ancillary buildings, rather than traditional subway grates.[52] The station is also compliant with current fire codes, whereas most existing stations are not.[53] Additionally, the station is waterproofed with concrete liners and fully drained.[54] In early plans, the Second Avenue Subway was supposed to have platform screen doors to assist with air-cooling, energy savings, ventilation, and track safety,[55] but this plan was scrapped in 2012 as cost-prohibitive.[56] According to an internal study prepared for the MTA in 2020, the 86th Street station could theoretically accommodate half-height platform edge doors. Full-height platform screen doors would be possible but would necessitate the installation of structural bracing and relocation of several mechanical systems.[57]

Artwork

In 2009, MTA Arts & Design selected Chuck Close from a pool of 300 potential artists to create the artwork for the station.[58] His work consists of a series of twelve portraits of the city's cultural figures,[59] spread over 1000square feet of wall.[60] [61] Each 10adj=midNaNadj=mid piece is made with tiles that are painted to create a mosaic-like effect.[62] The pieces cost $1 million and were installed near the exits and in the mezzanines.[62] Close's portraits at the station, titled Subway Portraits, fall into two main categories. The first category of portraits comprises artists whom Close is familiar with. The station contains portraits of composer Philip Glass in his youth; musician Lou Reed; photographer Cindy Sherman; painter Cecily Brown; artist Kara Walker; and painter Alex Katz. The second category is composed of portraits of younger, more ethnically diverse artists including Zhang Huan, Sienna Shields and Pozsi B. Kolor. In these portraits, Close aimed to highlight the cultural diversity of New York City. He also has two self-portraits within the station.[63]

Exits and ancillary buildings

There are 3 entrances and exits, which comprise 10 escalators and one elevator.[64] [65]

Exit locationExit TypeNumber of exits
Entrance 1
Within building at NE corner of Second Avenue and 83rd Street[66]
Escalator2 escalators
Entrance 2
(2 entry points)
NE corner of Second Avenue and 86th Street
EscalatorEach entry point has 2 escalators
Entrance 2
SE corner of Second Avenue and 86th Street
Elevator 1

There are also two ancillary buildings that store station equipment:[67] [68]

Originally, Entrance 2's escalator entrance was to be located inside the Yorkshire Towers apartment building at 305 East 86th Street, on the northeast corner of Second Avenue and 86th Street. In 2009, a Finding Of No Significant Impact by the Federal Transit Administration (FTA) found this to be unfeasible, so the Metropolitan Transportation Authority (MTA) revised the plan to two separate sidewalk entrances in front of the building.[69] During the planning process, it was determined that building a new entrance within the Yorkshire Towers would be too expensive and logistically unfeasible. The apartments directly above the entrance's location would have had to be structurally underpinned during construction, and the Food Emporium supermarket location would have had to close to make way for the new entrance. Of the three alternatives presented for moving the entrance, the MTA chose an alternative in which there would be two new escalator entrances on the north side of 86th Street, both flanking the semicircular driveway of Yorkshire Towers and facing away from the driveway. There was also a proposal to move the sidewalk escalator entrances to the south side of the street, as well as another proposal to build a new structure containing five elevators at the southeast corner of Second Avenue and 86th Street, in a manner similar to Entrance 3 of the adjacent 72nd Street station.

Controversy emerged over Entrance 2's location in February 2011, when a lawsuit was filed by the Yorkshire Towers over the location of Entrance 2.[70] [71] The entrances, planned to service 3,600 people an hour, were alleged in the lawsuit to be destroying the quality of life for building tenants, if the entrances were to be built in the location. The lawsuit was later dismissed because the suit had been filed two years after the FTA's FONSI was published, which was past the statute of limitations. A new lawsuit was filed on March 15, 2013, after the MTA started construction on the entrances.[72] In June 2013, that lawsuit was also dismissed.[73]

In May 2017, all three escalators in Entrance 1 were damaged by sprinklers activated by faulty sensors, causing the entire entrance to be temporarily closed.[74]

Effects

Since 2013, construction of the station has caused the value of real estate in the area to rise.[75] [76] Although the surrounding area's real estate prices had been declining since the 1990s, there had been increases in the purchases and leases of residential units around the area, causing real estate prices to rise again.[77] Some businesses near the station's construction site had also lost profits.[78] With the opening of the new station, business owners hoped to see an increase in patronage.[79] [80]

Second Avenue Subway Community Information Center

The Second Avenue Subway Community Information Center, which gave information about Phase I construction to community members, was located nearby, at 1628 Second Avenue between 84th and 85th Streets.[81] It opened on July 25, 2013.[82] [83] [84] On May 23, 2014, a new exhibit about the construction techniques used to build the Second Avenue Subway, titled En Route: The Techniques and Technologies Used to Build the Second Avenue Subway, was launched at the center.[85] [86] Throughout the process of construction, the MTA also gave intermittent tours of the construction site to Upper East Side residents with reservations.[87] The center received over 20,000 visitors in three years.[88] In 2017, the MTA opened a similar center outside the 125th Street station in East Harlem for Phase II.[89]

Nearby places

External links

Notes and References

  1. Web site: www.nycsubway.org: Second Avenue Subway: The Line That Almost Never Was. 1972. nycsubway.org. September 30, 2015.
  2. Web site: IND Second System 1929 Plan. nycsubway.org. March 25, 2016.
  3. Web site: Second Avenue Subway Project – History. October 19, 2002. February 15, 2016. https://web.archive.org/web/20021019053707/http://mta.info/planning/sas/sas_history_1.htm. October 19, 2002.
  4. News: Last Train Rumbles On Third Ave. 'El'; An Era Ends With Final Run of Third Avenue 'El' LAST TRAIN ROLLS ON THIRD AVE. 'EL'. The New York Times . August 23, 2016.
  5. See:
    • Web site: 2nd Avenue El . nycsubway.org . January 25, 2009 . https://web.archive.org/web/20090127041414/http://nycsubway.org/lines/2ndave-el.html . January 27, 2009 . live . mdy.
    • Web site: Second Avenue Local . Station Reporter . January 25, 2009 . https://web.archive.org/web/20090130064659/http://stationreporter.net/2avl.htm . January 30, 2009 . dead . mdy.
  6. See:
    • Web site: 3rd Avenue El . nycsubway.org . January 25, 2009 . https://web.archive.org/web/20090127041419/http://nycsubway.org/lines/3rdave-el.html . January 27, 2009 . live.
    • Web site: Third Avenue Local . Station Reporter . January 25, 2009 . https://web.archive.org/web/20100609061601/http://www.stationreporter.net/3avl.htm . June 9, 2010 . dead . mdy.
  7. Web site: nycsubway.org. The New York Transit Authority in the 1970s. October 27, 2016.
  8. Web site: Draft Environmental Statement, Second Avenue Subway, Route 132-A . Urban Mass Transportation Administration . nycsubway.org . August 1971 . May 22, 2014.
  9. Second Avenue Subway Final Environmental Impact Statement (FEIS), May 2004 Appendix B Development of Alternatives. May 2004. Metropolitan Transportation Authority. August 7, 2016. https://web.archive.org/web/20161122065059/http://web.mta.info/capital/sas_docs/feis/appendixb.pdf. November 22, 2016. live.
  10. News: 2d Avenue Subway to Get Just 3 Stops North of 57th. Moran. Nancy. August 28, 1970. The New York Times. 0362-4331. December 25, 2016. New York Times Archives.
  11. News: February 16, 1973. Notice of Public Hearing Southern Extension of the Second Avenue Line for the New York City Transit System. New York Daily News. December 8, 2018.
  12. http://www.nycsubway.org/wiki/Second_Avenue_Subway:_Timeline "Second Avenue Subway: Timeline"
  13. Web site: Second Avenue Subway - History. mta.info. Metropolitan Transportation Authority. dead. https://web.archive.org/web/20140408220035/http://web.mta.info/capconstr/sas/background.html. April 8, 2014. April 7, 2014.
  14. The Long, Tortured History of the Second Avenue Subway. Jewler. Sam. July 24, 2004. The New Yorker. August 14, 2015.
  15. Book: Manhattan East Side Transit Alternatives Study (MESA): Environmental Impact Statement. 1999. en.
  16. News: Burks. Edward C.. Work is Stopped on Subway Line; City Lacks Funds to Finish Part of 2d Ave. Project. September 26, 1975. The New York Times. October 4, 2015. live. https://web.archive.org/web/20180727115426/https://www.nytimes.com/1975/09/26/archives/work-is-stopped-on-subway-line-city-lacks-funds-to-finish-part-of.html. July 27, 2018. 41.
  17. http://www.rpa.org/pdf/metrolink.pdf Metrolink
  18. News: Is That Finally the Sound of a 2nd Ave. Subway?. Neuman. William. April 9, 2007. The New York Times. June 28, 2011.
  19. Web site: Excavation of West Tunnel for Second Avenue Subway Complete. February 4, 2011. Metropolitan Transportation Authority. October 26, 2016. October 27, 2016. https://web.archive.org/web/20161027192009/http://www.mta.info/news/2011/02/04/excavation-west-tunnel-second-avenue-subway-complete. dead.
  20. News: The Second Avenue subway explained. am New York. October 27, 2016.
  21. Web site: Drone takes tour of NYC's 2nd Avenue subway line. September 16, 2015. CBS News. October 27, 2016.
  22. Web site: Updates on NYC's Biggest Subway Projects: Second Avenue and East Side Access . Nonko . Emily . January 30, 2014 . NewYork.com . June 5, 2014 . dead . https://web.archive.org/web/20140517132213/http://www.newyork.com/articles/real-estate/updates-on-nycs-biggest-subway-projects-second-avenue-and-east-side-access-59421/ . May 17, 2014 .
  23. Web site: NY Construction. Top Projects. February 8, 2017 . 1.
  24. Web site: Excavation of West Tunnel for Second Avenue Subway Complete. February 4, 2011. Metropolitan Transportation Authority. June 28, 2011. October 27, 2016. https://web.archive.org/web/20161027192009/http://www.mta.info/news/2011/02/04/excavation-west-tunnel-second-avenue-subway-complete. dead.
  25. Web site: Rubinstein . Dana . Where is the Second Avenue Subway going? . Capital New York . October 23, 2013 . May 15, 2014 . https://web.archive.org/web/20160322132244/http://www.capitalnewyork.com/article/politics/2013/10/8533946/where-second-avenue-subway-going . March 22, 2016 . dead .
  26. Web site: 86th Street Station Entrance at 86th Street. June 26, 2007. Metropolitan Transportation Authority. October 27, 2016.
  27. News: MTA Awards Contract to Build 2nd Ave Subway Station at 86th St.. September 15, 2011. MTA.info. September 15, 2011.
  28. Web site: Skanksa JV set to build Second Avenue's 86th St. station :: Second Ave. Sagas . September 15, 2011 . Second Avenue Sagas . May 19, 2014.
  29. Web site: Construction to Start on Second Avenue Subway's 86th Street Station. Zimmer. Amy. September 15, 2011. DNAinfo New York. December 19, 2016. dead. https://web.archive.org/web/20130616051941/http://www.dnainfo.com/new-york/20110915/upper-east-side/construction-start-on-second-avenue-subways-86th-street-station. June 16, 2013. mdy-all.
  30. Web site: Metropolitan Transportation Authority. MTA.info. February 2013 Newsletter. February 2013.
  31. Web site: VIDEO: Construction of Second Ave. subway at 86th St. chugging along in NYC . NY Daily News . July 11, 2013 . May 19, 2014 . May 19, 2014 . https://web.archive.org/web/20140519225103/http://www.nydailynews.com/new-york/uptown/video-construction-avenue-subway-86th-st-chugging-article-1.1396638 . dead .
  32. Web site: MTA | news | Second Avenue Subway Reaches Major Milestones . MTA.info . May 19, 2014 . May 19, 2014 . https://web.archive.org/web/20140519183931/http://www.mta.info/news-second-avenue-subway/2013/11/22/second-avenue-subway-reaches-major-milestones . dead .
  33. Web site: Second Avenue subway's first phase is 76% done . . December 18, 2014 . December 19, 2014 . Hawkins, Andrew J..
  34. Web site: Second Avenue Subway Hits Key Milestone With Completion Of 86th Street Station Shell . . December 18, 2014 . December 19, 2014.
  35. Web site: Second Avenue Subway Station Shell at 86th Street Complete . . December 18, 2014 . October 27, 2016 . October 27, 2016 . https://web.archive.org/web/20161027124858/http://www.mta.info/press-release/nyc-transit/second-avenue-subway-station-shell-86th-street-complete . dead .
  36. Web site: Metropolitan Transportation Authority. MTA.info. May 2014 Newsletter. May 2014.
  37. Web site: Metropolitan Transportation Authority. MTA.info. April 2015 Newsletter. April 2015.
  38. Web site: Metropolitan Transportation Authority. MTA.info. March 2015 report from Transit & Bus Committee. 149. March 2015. dead. https://web.archive.org/web/20150404014641/http://web.mta.info/mta/news/books/pdf/150323_1030_Transit_BUS.pdf#page=149. April 4, 2015. mdy-all.
  39. News: 2 Stations on New 2nd Avenue Line May Not be Ready by December. Fitzsimmons. Emma G.. October 26, 2016. The New York Times. 0362-4331. October 27, 2016.
  40. Web site: McCowan . Candace . Decades in the making, Second Avenue Subway set to open to the public . ABC7 New York . December 31, 2016 . January 1, 2017.
  41. Web site: Fitzsimmons . Emma G. . Wolfe . Jonathan . Second Avenue Subway Opening: What to Know . The New York Times . January 1, 2017 . January 1, 2017.
  42. Web site: SUB-DIVISION B TRAIN OPERATOR/CONDUCTOR ROAD & NON-ROAD WORK PROGRAMS IN EFFECT: NOVEMBER 6, 2016. July 29, 2016. progressiveaction.info. New York City Transit. August 19, 2016.
  43. Web site: Tunneling Begins Under Second Avenue. May 14, 2010. Metropolitan Transportation Authority. June 28, 2011. https://web.archive.org/web/20110606084216/http://mta.info/news/stories/?story=63. June 6, 2011. dead.
  44. Web site: A Subterranean Stroll Through NYC's Newest Train Tunnel . . May 2, 2014 . May 13, 2014 . Hession, Michael.
  45. Web site: Second Avenue Subway progress: Dec. 2016 end date on track. AM New York. Rivoli, Dan. May 1, 2014. May 14, 2014.
  46. Web site: Second Avenue Subway March 2014 Public Workshop Follow-Up Report, page 23. Metropolitan Transportation Authority. April 21, 2016.
  47. Web site: A Tour of NYC's Newest Subway Station With Its Architect. September 21, 2015. Curbed NY. September 24, 2015.
  48. Web site: MTA Capital Construction. apta.com. Second Avenue Subway — Past, Present & Future. dead. https://web.archive.org/web/20150923172747/http://www.apta.com/mc/multimodal/previous/2010/Presentations/Planning-for-the-Second-Avenue-Subway-From-Dream-to.pdf. September 23, 2015. mdy-all.
  49. Web site: Thorpe . Harriet . 2017-01-19 . AECOM-Arup completes the first phase of New York’s Second Avenue Subway expansion . 2024-07-31 . . en.
  50. News: Cooler Subways Coming Eventually. Donohue. Pete. August 4, 2006. New York Daily News. December 12, 2008. https://web.archive.org/web/20071010000252/http://www.nydailynews.com/news/2006/08/04/2006-08-04_cooler_subways_coming__eventually.html. October 10, 2007. live.
  51. News: No Heel Hazards (or Gusts) as Subway Expands . New York Times . September 30, 2013 . May 5, 2014 . Roberts, Sam . New York.
  52. News: Second Avenue subway line construction is progressing: officials . . May 16, 2014 . May 19, 2014 . Nolan, Caitlin.
  53. Web site: Society for Mining, Metallurgy and Exploration. NEW YORK CITY—Second Avenue Subway: MTA's Second Avenue Station and Tunnels Project.
  54. News: 2nd Ave. Subway Platforms May Get Glass Walls and Sliding Doors. Neuman. William. April 5, 2007. The New York Times. 0362-4331. January 12, 2017.
  55. News: No Seoul-style platform doors for New York subways, even in new stations. Politico. December 7, 2012. Dana . Rubinstein.
  56. Web site: New York City Transit System-wide Platform Screen Door Feasibility Study Summary of Conclusions. February 2020. Stv Inc.. Metropolitan Transportation Authority. 3388. January 28, 2022.
  57. News: Art Underground: A First Look at the Second Avenue Subway. Kennedy. Randy. December 19, 2016. The New York Times. 0362-4331. December 19, 2016.
  58. Web site: Ben Yakas . Here's What The Second Avenue Subway Will Look Like When It's Filled With Art . Gothamist . January 22, 2014 . May 5, 2014 . dead . https://web.archive.org/web/20140330041727/http://gothamist.com/2014/01/22/heres_what_the_second_avenue_subway.php . March 30, 2014 . mdy-all .
  59. Web site: Noreen . Malone . May 14, 2012. Chuck Close Will Make the Second Avenue Subway Pretty. New York.
  60. Web site: Subway Art on the Future Second Avenue Subway Line Revealed . Untapped Cities . January 22, 2014 . May 19, 2014 . Mondkar, Bushan.
  61. Web site: Warerkar . Tanay . Chuck Close will bring mosaic portraits to the Second Avenue Subway . Curbed NY . July 7, 2016 . December 19, 2016.
  62. Web site: MTA - Arts & Design NYCT Permanent Art . 2022-05-19 . web.mta.info.
  63. Web site: Metropolitan Transportation Authority. MTA.info. Newsletter February 2012. February 2012.
  64. Web site: MTA Neighborhood Maps: Upper East Side. 2016. mta.info. Metropolitan Transportation Authority. December 30, 2016.
  65. Web site: Introducing the Second Avenue Subway Make Second Avenue Q subway service, your first choice. December 30, 2016. mta.info. Metropolitan Transportation Authority. December 30, 2016.
  66. Web site: Metropolitan Transportation Authority. MTA.info. July 2015 Task Force Presentation. 36. July 2015.
  67. Web site: Metropolitan Transportation Authority. MTA.info. August 2015 Newsletter. August 2015.
  68. Web site: Finding Of No Significant Impact (FONSI): Second Avenue Subway: 72nd Street and 86th Street Station Entrances. October 29, 2009. mta.info. United States Department of Transportation. December 19, 2016.
  69. Web site: Upper East Side Building Sues MTA Over Planned Subway Entrances . DNA Info . February 17, 2011 . May 19, 2014 . dead . https://web.archive.org/web/20140519192839/http://www.dnainfo.com/new-york/20110216/upper-east-side/upper-east-side-building-sues-mta-over-planned-subway-entrances . May 19, 2014 . mdy-all .
  70. Web site: Owners and Tenants of Yorkshire Towers Sue to Relocate Planned 86th Street Entrances to Second Avenue Subway . Anderson Kill . February 17, 2011 . May 19, 2014 . dead . https://web.archive.org/web/20140519193321/http://www.andersonkill.com/news_article.asp?newsid=1187 . May 19, 2014 . mdy .
  71. Web site: UES residents sue MTA over Second Ave Subway entrance. Brown. Stephen Rex. March 25, 2013. NY Daily News. December 19, 2016.
  72. Yorkshire Towers Company, L.P. et al., v. United States Department of Transportation, et al.. 11 Civ. 1058 (TPG) . S.D.N.Y.. December 1, 2011. http://docs.justia.com/cases/federal/district-courts/new-york/nysdce/1:2011cv01058/375295/66/0.pdf?1322836800. March 27, 2018.
  73. Web site: 2nd Ave. Subway's 83rd St. Entrance Closed Due to Broken Escalators. Weaver. Shaye. May 16, 2017. DNAinfo New York. May 17, 2017. dead. https://web.archive.org/web/20170912052511/https://www.dnainfo.com/new-york/20170516/yorkville/second-avenue-subway-83rd-street-entrance-exit-closed-escalator-repairs. September 12, 2017. mdy-all.
  74. Web site: Shops along Second Ave. subway line construction sites want big bucks in 2014 . NY Daily News . January 7, 2014 . May 5, 2014 . March 16, 2014 . https://web.archive.org/web/20140316082737/http://www.nydailynews.com/new-york/uptown/big-bucks-shops-ave-subway-line-article-1.1568653 . dead .
  75. Web site: Upper East Side sees boost from Second Avenue subway progress . The Real Deal . March 1, 2014 . May 13, 2014 . Acitelli, Tom.
  76. News: Hughes . C.J. . Yorkville Bets on the Second Avenue Subway . The New York Times . April 8, 2016 . April 13, 2016.
  77. News: Promise of New Subways Has West Siders Excited and East Siders Skeptical . . October 2, 2014 . October 26, 2014 . Schlossberg, Tatiana.
  78. News: Businesses hope for boost with 2nd Avenue subway launch. December 20, 2016. ABC7 New York. en-US. December 23, 2016.
  79. News: UES community, officials excited for 2nd Ave. subway. Barone. Vincent. December 20, 2016. am New York. December 23, 2016.
  80. Web site: mta.info | Capital Programs Second Avenue Subway . MTA.info . May 19, 2014.
  81. Web site: MTA | news | MTA Opens Second Avenue Subway Community Information Center . MTA.info . July 25, 2013 . May 19, 2014 . May 19, 2014 . https://web.archive.org/web/20140519204533/http://www.mta.info/news/2013/07/25/mta-opens-second-avenue-subway-community-information-center . dead .
  82. Web site: MTA Opens Second Avenue Subway Community Information Center . DNA Info . July 26, 2013 . May 19, 2014 . dead . https://web.archive.org/web/20140519205107/http://www.dnainfo.com/new-york/20130726/upper-east-side/mta-opens-second-avenue-subway-community-information-center . May 19, 2014 . mdy-all .
  83. News: MTA Unveils Second Avenue Subway Information Center On Upper East Side. CBS New York . July 25, 2013 . May 19, 2014.
  84. Web site: MTA Second Avenue Subway Launches New Exhibit: En Route: The Techniques and Technologies Used to Build the Second Avenue Subway. Metropolitan Transportation Authority. May 23, 2014. October 26, 2016. October 18, 2016. https://web.archive.org/web/20161018092020/http://www.mta.info/press-release/nyc-transit/mta-second-avenue-subway-launches-new-exhibit-en-route-techniques-and. dead.
  85. Web site: 670 Feet Under: The Second Avenue Subway and 5 More Mega-Projects – Architizer. Architizer. September 16, 2014.
  86. Web site: Kanno-Youngs . Zolan . Sneaking a Peek at the Second Avenue Subway Line . WSJ . June 19, 2016 . June 20, 2016.
  87. Web site: Information center opening in May for next phase of Second Avenue Subway. April 25, 2017. New York's PIX11 / WPIX-TV. April 25, 2017.
  88. News: Martinez. Jose. New center gives glimpse of Second Avenue Subway's future. September 22, 2017. Spectrum News - NY1. September 28, 2017. live. https://web.archive.org/web/20170923072307/http://www.ny1.com/nyc/all-boroughs/transit/2017/09/22/new-center-gives-glimpse-of-second-avenue-subway-s-future.html. September 23, 2017.