66th Street–Lincoln Center station explained

66 Street–Lincoln Center
Accessible:yes
Address:West 66th Street & Broadway
New York, NY
Borough:Manhattan
Locale:Lincoln Square, Upper West Side
Coordinates:40.774°N -73.982°W
Division:IRT
Line:IRT Broadway–Seventh Avenue Line
Service:Broadway-Seventh local
Service Header:Broadway-Seventh local header
Connection: NYCT Bus:
MTA Bus:
Platforms:2 side platforms
Tracks:4
Structure:Underground
Open Date:[1]

The 66th Street–Lincoln Center station is a local station on the IRT Broadway–Seventh Avenue Line of the New York City Subway. Located at the intersection of 66th Street and Broadway in the Lincoln Square neighborhood of Manhattan, it is served by the 1 train at all times and by the 2 train during late nights.

The 66th Street station was constructed for the Interborough Rapid Transit Company (IRT) as part of the city's first subway line, which was approved in 1900. Construction of the line segment that includes the 66th Street station began on August 22 of the same year. The station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway. The station's platforms have been lengthened since opening.

The 66th Street station contains two side platforms and four tracks; express trains use the inner two tracks to bypass the station. The station was built with tile and mosaic decorations. The platforms contain exits to 66th Street and Broadway as well as to Lincoln Center, and to schools in the Center such as The Juilliard School and Fordham Lincoln Center. The station contains elevators from the street, which make it compliant with the Americans with Disabilities Act of 1990.

History

Construction and opening

Planning for a subway line in New York City dates to 1864. However, development of what would become the city's first subway line did not start until 1894, when the New York State Legislature passed the Rapid Transit Act.[2] The subway plans were drawn up by a team of engineers led by William Barclay Parsons, the Rapid Transit Commission's chief engineer. It called for a subway line from New York City Hall in lower Manhattan to the Upper West Side, where two branches would lead north into the Bronx.[3] A plan was formally adopted in 1897, and all legal conflicts concerning the route alignment were resolved near the end of 1899.

The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[4] under which it would construct the subway and maintain a 50-year operating lease from the opening of the line. In 1901, the firm of Heins & LaFarge was hired to design the underground stations. Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.

The 66th Street station was constructed as part of the IRT's West Side Line (now the Broadway–Seventh Avenue Line) from 60th Street to 82nd Street, for which work had begun on August 22, 1900. Work for that section had been awarded to William Bradley. By late 1903, the subway was nearly complete, but the IRT Powerhouse and the system's electrical substations were still under construction, delaying the system's opening.[5] The 66th Street station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway from City Hall to 145th Street on the West Side Branch.[2]

Service changes and station renovations

1910s to 1930s

After the first subway line was completed in 1908,[6] the station was served by local trains along both the West Side (now the Broadway–Seventh Avenue Line to Van Cortlandt Park–242nd Street) and East Side (now the Lenox Avenue Line). West Side local trains had their southern terminus at City Hall during rush hours and South Ferry at other times, and had their northern terminus at 242nd Street. East Side local trains ran from City Hall to Lenox Avenue (145th Street).[7]

To address overcrowding, in 1909, the New York Public Service Commission proposed lengthening the platforms at stations along the original IRT subway.[8] As part of a modification to the IRT's construction contracts made on January 18, 1910, the company was to lengthen station platforms to accommodate ten-car express and six-car local trains. In addition to $1.5 million (equivalent to $ million in) spent on platform lengthening, $500,000 (equivalent to $ million in) was spent on building additional entrances and exits. It was anticipated that these improvements would increase capacity by 25 percent.[9] Platforms at local stations, such as the 66th Street station, were lengthened by between 20and. Both platforms were extended to the north and south.[9] Six-car local trains began operating in October 1910. The Broadway–Seventh Avenue Line opened south of Times Square–42nd Street in 1918, and the original line was divided into an H-shaped system. The original subway north of Times Square thus became part of the Broadway–Seventh Avenue Line, and all local trains were sent to South Ferry.[10]

In December 1922, the Transit Commission approved a $3 million project to lengthen platforms at 14 local stations along the original IRT line, including 66th Street and five other stations on the Broadway–Seventh Avenue Line. Platform lengths at these stations would be increased from 225to.[11] [12] The commission postponed the platform-lengthening project in September 1923, at which point the cost had risen to $5.6 million.[13] [14]

1940s to 1970s

The city government took over the IRT's operations on June 12, 1940.[15] [16] The IRT routes were given numbered designations in 1948 with the introduction of "R-type" rolling stock, which contained rollsigns with numbered designations for each service.[17] The Broadway route to 242nd Street became known as the 1 and the Lenox Avenue route as the 3.[18]

The original IRT stations north of Times Square could barely fit local trains of five or six cars depending on the configuration of the trains. Stations on the line from 50th Street to 96th Street, including this station but excluding the 91st Street station, had their platforms extended in the 1950s to accommodate ten-car trains as part of a $100 million rebuilding program (equivalent to $ million in). The joint venture of Rosoff Bros Inc. and Joseph Meltzer Associates Inc. received a contract to remodel the 50th Street, 59th Street, and 66th Street stations.[19] in February 1957.[20] The platform extensions at the local stations were completed by early 1958.[21] Once the project was completed, all 1 trains became local and all 2 and 3 trains became express, and eight-car local trains began operation. Increased and lengthened service was implemented during peak hours on the 1 train on February 6, 1959.[22] Due to the lengthening of the platforms at 86th Street and 96th Street, the intermediate 91st Street station was closed on February 2, 1959, because it was too close to the other two stations.[23]

On November 29, 1962, a new entrance at the station opened, leading to the lobby of the Philharmonic (now David Geffen) Hall of Lincoln Center.[24] The entrance led from the downtown platform of the station and also provided access to the uptown platform by an underpass at the station's south end. This entrance was built as part of a $10.2 million underground complex by the New York City Parks Department for the Philharmonic Hall. The project was partially funded by a Federal grant, and the work was contracted out to Slattery Construction Company.[25]

1980s to present

In 1981, the MTA announced the creation of its Culture Stations program to install public art in the subway. The Culture Stations program was started to deter graffiti, and was inspired by legislation in the New York City Council that mandated that 1% of the cost of constructing public buildings be used for art. The program was modeled on the Louvre – Rivoli station on the Paris Métro, which featured reproductions of the artwork on display in the Louvre. Four stations, namely 66th Street, Astor Place, Eastern Parkway–Brooklyn Museum, and Fifth Avenue/53rd Street, were selected for the program due to their proximity to cultural institutions.[26] [27] These would be among the first stations in the MTA's new station refurbishment program, which began in 1982.[28] Initially, there was funding only for the Astor Place and Fifth Avenue/53rd Street stations.[29] The MTA announced in 1983 that it would allocate funding to renovate the 66th Street station as part of its capital program.[30]

The renovation was supposed to have been partially funded by developer Daniel Brodsky, who had contributed $1.06 million toward the project in exchange for more floor space at 45 West 67th Street, an apartment building that Brodsky was constructing nearby. Several developers would have contributed additional funds for the project.[31] However, the funds remained unused for several years.[31] [32] The Eastern Parkway and 66th Street stations had still not been renovated by 1986, even though the Astor Place and Fifth Avenue/53rd Street projects had been completed by then.[33] According to New York City Planning Commission chairwoman Sylvia Deutsch, the MTA had chosen to delay the 66th Street project.[31]

In April 1988,[34] the New York City Transit Authority (NYCTA) unveiled plans to speed up service on the Broadway–Seventh Avenue Line through the implementation of a skip-stop service: the 9 train.[35] When skip-stop service started in 1989, it was only implemented north of 137th Street–City College on weekdays, and 66th Street was served by both the 1 and the 9.[36] [37] [38] Skip-stop service ended on May 27, 2005, as a result of a decrease in the number of riders who benefited.[39] [40]

In 1996, the MTA announced that it would renovate the 66th Street station over the next three years starting that September. The station was rebuilt to designs by Lee Harris Pomeroy.[41] As part of the $16 million project, the station would get new floor and wall tiles, new lighting, a new staircase, and would have two elevators installed to make the station compliant with the Americans with Disabilities Act of 1990.[42] In addition, communication and power systems were upgraded, and control areas were redesigned. The station's original terra cotta mosaics were restored as part of the project, and new "LC" mosaics were installed in a similar design to the originals.[43] As part of the Arts for Transit program, mosaics by Nancy Spero were installed on the platforms.[44] At the time of the renovation, the station had seen a 12 percent increase in ridership over the past few years because of the presence of new apartment buildings and popular businesses nearby.[45]

The 66th Street station received esthetic improvements in early 2024 as part of the MTA's Re-New-Vation program.[46] [47]

Station layout

Like other local stations, 66th Street has four tracks and two side platforms. The station is served by the 1 at all times and by the 2 during late nights; the center express tracks are used by the 2 train during daytime hours and the 3 train at all times. The station is between 72nd Street to the north and 59th Street–Columbus Circle to the south. The platforms were originally long, like at other local stations on the original IRT,[3] but as a result of the 1958–1959 platform extension, became long.[21] The 66th Street station is fully wheelchair-accessible, with elevators connecting the street and platforms.[48] There is also a crossunder between the uptown and downtown side platforms at the extreme south end of the station, which is not wheelchair-accessible.

Design

As with other stations built as part of the original IRT, the station was constructed using a cut-and-cover method.[49] The tunnel is covered by a U-shaped trough that contains utility pipes and wires. The bottom of this trough contains a foundation of concrete no less than 4inches thick. Each platform consists of 3inches concrete slabs, beneath which are drainage basins. The original platforms contain circular, cast-iron Doric-style columns spaced every 15feet, while the platform extensions contain I-beam columns. Additional columns between the tracks, spaced every, support the jack-arched concrete station roofs.[50] There is a 1abbr=NaNabbr= gap between the trough wall and the platform walls, which are made of 4abbr=NaNabbr=-thick brick covered over by a tiled finish.[50]

The decorative scheme consists of yellow faience station-name tablets, buff tile bands, a yellow faience cornice, and blue faience plaques.[50] The mosaic tiles at all original IRT stations were manufactured by the American Encaustic Tile Company, which subcontracted the installations at each station.[50] The original decorative work was performed by tile contractor Manhattan Glass Tile Company and faience contractor Grueby Faience Company.[50] As part of the station's 1990s renovation, plaques with the initials "L" and "C", with the number "66" overlaid on them, were installed; they are designed in a style similar to the original mosaics. The ceilings of the original platforms and fare control areas contain plaster molding.[50]

The walls at the platform level contain a mosaic artwork called Artemis, Acrobats, Divas and Dancers, which was designed by local artist Nancy Spero as part of the MTA Arts & Design program.[51] [52] The artwork, installed in 2001, consists of 22 panels that depict a diva in various settings, a reference to the station's location next to Lincoln Center.

Exits

There are two staircases and one elevator on the southeastern corner of Broadway and 66th Street, leading to the northbound platform. Two staircases and one elevator on the southwestern corner of the same intersection lead to the southbound platform. Both sets of entrances and exits lead directly to their respective platform levels. A third set of exits, at the extreme south end of the southbound platform, contains a stair to the southwestern corner of Columbus Avenue and 65th Street, as well as a passageway to David Geffen Hall. This section of the station contains the crossunder.[53]

Nearby points of interest

The station provides access to Lincoln Center for the Performing Arts just to the south, with Alice Tully Hall just to the west. All of the Lincoln Center venues are connected by underground concourses near the southern end of the station. Dante Park, upstairs at the south end, is named for the poet Dante Alighieri, whose statue is found there. Richard Tucker Park is nearby, at the north end of Lincoln Square.[53]

A number of schools are nearby as well, including the Fiorello H. LaGuardia High School of Music & Art and Performing Arts and some small schools located in the former Martin Luther King Jr. High School building.[53]

This station also provides access to:[53]

External links

Notes and References

  1. News: subscription. Our Subway Open: 150,000 Try It; Mayor McClellan Runs the First Official Train.. October 28, 1904. The New York Times. April 21, 2020. en-US. 0362-4331. 1. November 12, 2020. https://web.archive.org/web/20201112012129/https://timesmachine.nytimes.com/timesmachine/1904/10/28/118948832.html. live.
  2. Book: Walker. James Blaine. Fifty Years of Rapid Transit — 1864 to 1917. 1918. Law Printing. New York, N.Y.. November 6, 2016.
  3. Web site: October 23, 1979. Interborough Rapid Transit System, Underground Interior. November 19, 2019. New York City Landmarks Preservation Commission. March 27, 2016. https://web.archive.org/web/20160327141814/http://s-media.nyc.gov/agencies/lpc/lp/1096.pdf. live.
  4. Book: Report of the Board of Rapid Transit Railroad Commissioners for the City of New York For The Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the Auditor. Board of Rapid Transit Railroad Commissioners. 1905. 229–236.
  5. News: November 14, 1903 . First of Subway Tests; West Side Experimental Trains to be Run by Jan. 1 Broadway Tunnel Tracks Laid, Except on Three Little Sections, to 104th Street -- Power House Delays. . en-US . The New York Times . limited . May 10, 2022 . 0362-4331 . May 5, 2022 . https://web.archive.org/web/20220505030752/https://www.nytimes.com/1903/11/14/archives/first-of-subway-tests-west-side-experimental-trains-to-be-run-by.html . live .
  6. News: limited. Our First Subway Completed At Last — Opening of the Van Cortlandt Extension Finishes System Begun in 1900 — The Job Cost $60,000,000 — A Twenty-Mile Ride from Brooklyn to 242d Street for a Nickel Is Possible Now. August 2, 1908. The New York Times. November 6, 2016. 10. December 23, 2021. https://web.archive.org/web/20211223112020/https://www.nytimes.com/1908/08/02/archives/our-first-subway-completed-at-last-opening-of-the-van-cortlandt.html. live.
  7. Book: Brooklyn Daily Eagle Almanac. Brooklyn Daily Eagle. 1916. 119. December 21, 2020. May 11, 2021. https://web.archive.org/web/20210511155639/https://babel.hathitrust.org/cgi/pt?id=nyp.33433081730503;view=1up;seq=151. live. Herries . William .
  8. Web site: Hood. Clifton. 1978. The Impact of the IRT in New York City. December 20, 2020. Historic American Engineering Record. 146–207 (PDF pp. 147–208). January 17, 2021. https://web.archive.org/web/20210117001227/https://tile.loc.gov/storage-services/master/pnp/habshaer/ny/ny0300/ny0387/data/ny0387data.pdf. live.
  9. Book: Report of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1910. 1911. Public Service Commission. en. January 7, 2021. January 20, 2021. https://web.archive.org/web/20210120015525/https://books.google.com/books?id=0fBLAQAAMAAJ&q=%20zoological%20station&pg=PA596. live.
  10. News: August 2, 1918. Open New Subway Lines to Traffic; Called a Triumph. 1. The New York Times. subscription. October 4, 2011. 0362-4331. August 3, 2019. https://web.archive.org/web/20190803013952/https://timesmachine.nytimes.com/timesmachine/1918/08/02/97011929.pdf. live.
  11. News: December 17, 1922 . 33d Street to Be I.R.T. Express Stop; Reconstruction One of Many Station Improvements Ordered by Commission. . en-US . The New York Times . June 21, 2022 . 0362-4331 . June 21, 2022 . https://web.archive.org/web/20220621003434/https://www.nytimes.com/1922/12/17/archives/33d-street-to-be-irt-express-stop-reconstruction-one-of-many.html . live .
  12. News: December 18, 1922 . $4,000,000 in Construction on I. R. T. Ordered: 33d St. on East Side Subway Will Be Express Stop; Local Stations to Have 10-Car Train Capacity Aim to Speed Service Improvements Will Relieve Congestion Along Both Routes. Board Believes . 22 . New-York Tribune . .
  13. News: September 7, 1923. Express Stop Plan Opposed by I.R.T.; Officials Say Money Is Not Available for Change at 33d Street Station.. en-US. The New York Times. June 21, 2022. 0362-4331. June 21, 2022. https://web.archive.org/web/20220621154840/https://www.nytimes.com/1923/09/07/archives/express-stop-plan-opposed-by-irt-officials-say-money-is-not.html. live.
  14. News: . I. R. T. Wins Delay At Subway Platform Extension Hearing: Transit Commission Head Tells Meeting Widening West Side Stations Would Increase Capacity 25 P. C . September 7, 1923 . 6 . New-York Tribune.
  15. News: June 13, 1940 . City Transit Unity Is Now a Reality; Title to I.R.T. Lines Passes to Municipality, Ending 19-Year Campaign . en-US . The New York Times . subscription. May 14, 2022 . 0362-4331 . January 7, 2022 . https://web.archive.org/web/20220107193115/https://www.nytimes.com/1940/06/13/archives/city-transit-unity-is-now-a-reality-title-to-irt-lines-passes-to.html . live .
  16. News: June 13, 1940 . Transit Unification Completed As City Takes Over I. R. T. Lines: Systems Come Under Single Control After Efforts Begun in 1921; Mayor Is Jubilant at City Hall Ceremony Recalling 1904 Celebration . 25 . New York Herald Tribune . .
  17. Web site: Brown . Nicole . How did the MTA subway lines get their letter or number? NYCurious . amNewYork . May 17, 2019 . January 27, 2021 . March 2, 2021 . https://web.archive.org/web/20210302020704/https://www.amny.com/transit/nyc-subway-name-1-31116195/ . live .
  18. Friedlander. Alex. Lonto. Arthur. Raudenbush. Henry. April 1960. A Summary of Services on the IRT Division, NYCTA. New York Division Bulletin. Electric Railroaders' Association. 3. 1. 2–3. January 27, 2021. September 14, 2020. https://web.archive.org/web/20200914232631/https://erausa.org/pdf/bulletin/1960/1960-01-bulletin.pdf. live.
  19. News: May 26, 1958 . West Side Subway Job Is Gaining: Station Project Months Ahead . 12 . New York Herald Tribune . .
  20. News: Katz . Ralph . May 10, 1958 . IRT To Complete Repairs in a Year; Broadway Express Will Be Modified and Stations Revamped by June . en-US . The New York Times . live . July 1, 2022 . https://web.archive.org/web/20181006235831/https://www.nytimes.com/1958/05/10/archives/irt-to-complete-repairs-in-a-year-broadway-express-will-be-modified.html . October 6, 2018 . 0362-4331.
  21. February 2009. High-Speed Broadway Local Service Began in 1959. The Bulletin. New York Division, Electric Railroaders' Association. 52. 2. August 26, 2016. Issuu. September 16, 2016. https://web.archive.org/web/20160916212657/https://issuu.com/erausa/docs/2009-02-bulletin/1. live.
  22. News: February 7, 1959. Wagner Praises Modernized IRT — Mayor and Transit Authority Are Hailed as West Side Changes Take Effect. 21. The New York Times. subscription. November 6, 2016. 0362-4331. January 1, 2018. https://web.archive.org/web/20180101082503/http://www.nytimes.com/1959/02/07/archives/wagner-praises-modernized-irt-mayor-and-transit-authority-are.html?_r=0. live.
  23. News: Aciman. Andre. January 8, 1999. My Manhattan — Next Stop: Subway's Past. The New York Times. limited. August 26, 2016. 0362-4331. August 28, 2016. https://web.archive.org/web/20160828202733/http://www.nytimes.com/1999/01/08/arts/my-manhattan-next-stop-subway-s-past.html. live.
  24. News: 30 Nov 1962 . Lincoln Center IRT Entrance . 15 . New York Herald Tribune . 1941-0646 . .
  25. News: November 29, 1962. Philharmonic Hall Entrance To IRT Subway Opens Today. en-US. The New York Times. subscription. August 26, 2019. 0362-4331. August 26, 2019. https://web.archive.org/web/20190826163333/https://www.nytimes.com/1962/11/29/archives/philharmonic-hall-entrance-to-irt-subway-opens-today.html. live.
  26. Book: Art and the Subway: New York Underground. Fitzpatrick. Tracy. 2009. Rutgers University Press. 9780813544526. 229.
  27. News: Wallach. Amei. September 11, 1985. The Arts Go Underground. 145. Newsday. July 3, 2022. July 3, 2022. https://web.archive.org/web/20220703193851/https://www.newspapers.com/clip/104891768/the-arts-go-undergroundamei-wallach/. live.
  28. News: Untangling Knots in the Subway; Architect's Challenge Is to Make DeKalb Station Flow. February 3, 2000. The New York Times. September 12, 2019. 0362-4331. May 8, 2022. https://web.archive.org/web/20220508174802/https://www.nytimes.com/2000/02/03/nyregion/untangling-knots-subway-architect-s-challenge-make-dekalb-station-flow.html. live.
  29. News: Anderson. Susan Heller. August 9, 1982. How Culture in the Subways May Look. en-US. The New York Times. July 3, 2022. 0362-4331. July 3, 2022. https://web.archive.org/web/20220703164714/https://www.nytimes.com/1982/08/09/theater/how-culture-in-the-subways-may-look.html. live.
  30. News: Goldman . Ari L. . April 28, 1983 . M.T.A. Making Major Addition to Capital Plan . en-US . The New York Times . live . July 2, 2022 . https://web.archive.org/web/20220425151916/https://www.nytimes.com/1983/04/28/world/mta-making-major-addition-to-capital-plan.html . April 25, 2022 . 0362-4331.
  31. News: Lueck. Thomas J.. July 23, 1989. The Bulk-for-Benefits Deal in Zoning. en-US. The New York Times. July 3, 2022. 0362-4331. December 5, 2021. https://web.archive.org/web/20211205224356/https://www.nytimes.com/1989/07/23/realestate/the-bulk-for-benefits-deal-in-zoning.html. live.
  32. News: Henican . Ellis . August 25, 1992 . Subway Windfall Nears Last Stop . 6, 91 . Newsday . July 2, 2022 . July 3, 2022 . https://web.archive.org/web/20220703004928/https://www.newspapers.com/clip/104843740/subway-windfall-nears-last-stopellis/ . live .
  33. News: Brooke. James. June 20, 1986. In Subway, an Accent on Culture. en-US. The New York Times. July 4, 2022. 0362-4331. July 4, 2022. https://web.archive.org/web/20220704022057/https://www.nytimes.com/1986/06/20/nyregion/in-subway-an-accent-on-culture.html. live.
  34. News: Brozan. Nadine. June 4, 1989. 'Skip-Stop' Subway Plan Annoys No. 1 Riders. The New York Times. limited. June 15, 2016. 0362-4331. August 10, 2016. https://web.archive.org/web/20160810125540/http://www.nytimes.com/1989/06/04/nyregion/skip-stop-subway-plan-annoys-no-1-riders.html. live.
  35. News: Moore. Keith. June 10, 1988. TA's skip-stop plan hit. New York Daily News. November 8, 2018. November 8, 2018. https://web.archive.org/web/20181108224523/https://www.newspapers.com/clip/25210677/daily_news/. live.
  36. News: August 20, 1989.
    1. 1 Riders: Your Service is Changing
    . New York Daily News. November 8, 2018. November 8, 2018. https://web.archive.org/web/20181108224708/https://www.newspapers.com/clip/22823286/daily_news/. live.
  37. Web site: August 1989. Announcing 1 and 9 Skip-Stop Service on the Broadway-Seventh Avenue Line. August 1, 2009. New York City Transit Authority. June 26, 2020. https://web.archive.org/web/20200626000015/http://subwaynut.com/brochures/1and9skipstop.pdf. dead.
  38. News: Lorch. Donatella. August 22, 1989. New Service For Subways On West Side. The New York Times. limited. June 15, 2016. 0362-4331. August 10, 2016. https://web.archive.org/web/20160810113522/http://www.nytimes.com/1989/08/22/nyregion/new-service-for-subways-on-west-side.html. live.
  39. News: Chan. Sewell. May 25, 2005. On Its Last Wheels, No. 9 Line Is Vanishing on Signs. The New York Times. limited. August 29, 2016. 0362-4331. March 17, 2015. https://web.archive.org/web/20150317100921/http://www.nytimes.com/2005/05/25/nyregion/25train.html. live.
  40. Web site: May 7, 2005. Noteworthy – 9 discontinued. dead. https://web.archive.org/web/20050507104933/http://www.mta.info/nyct/service/9_discont.htm. May 7, 2005. September 18, 2016.
  41. News: Fried. Joseph P.. February 3, 2000. Untangling Knots in the Subway; Architect's Challenge Is to Make DeKalb Station Flow. en-US. The New York Times. limited. December 27, 2020. 0362-4331. May 8, 2022. https://web.archive.org/web/20220508174802/https://www.nytimes.com/2000/02/03/nyregion/untangling-knots-subway-architect-s-challenge-make-dekalb-station-flow.html. live.
  42. News: Walker. Andrea K.. July 21, 1996. Neighborhood Report: Upper West Side; Lincoln Center Tunes Up for Subway Work. en-US. The New York Times. limited. July 29, 2021. 0362-4331. July 29, 2021. https://web.archive.org/web/20210729141519/https://www.nytimes.com/1996/07/21/nyregion/neihborhood-report-upper-west-side-lincoln-center-tunes-up-for-subway-work.html. live.
  43. News: Luo . Michael . 2004-04-14 . The Subway That Started It All; 100 Years Later, Faded Traces of City's Original Remain . en-US . The New York Times . 2023-06-14 . 0362-4331.
  44. Web site: 66th Street Lincoln Center Station. live. July 29, 2001. LHPArchitects. en-US. https://web.archive.org/web/20210729141520/https://www.lhparch.com/66th-street-lincoln-center-subway . July 29, 2021 .
  45. News: Ramirez. Anthony. July 5, 1998. Neighborhood Report: Lincoln Center; New Station Chugs Along. en-US. The New York Times. July 4, 2022. 0362-4331. July 4, 2022. https://web.archive.org/web/20220704022206/https://www.nytimes.com/1998/07/05/nyregion/neighborhood-report-lincoln-center-new-station-chugs-along.html. live.
  46. Web site: Euzarraga . Matthew . Mocker . Greg . 13 NYC subway stations to get repairs and remodels under MTA 'Re-NEW-vations' enhancements . PIX11 . January 26, 2024 . January 28, 2024.
  47. Web site: Simko-Bednarski . Evan . MTA cleans, fixes Lincoln Center No. 1 subway stop in Manhattan during weekend shutdown . New York Daily News . January 26, 2024 . January 28, 2024.
  48. Web site: MTA Accessible Stations . MTA . 2022-05-20 . 2022-07-05 . May 15, 2020 . https://web.archive.org/web/20200515112641/https://new.mta.info/accessibility/stations . live .
  49. Web site: Scott. Charles. 1978. Design and Construction of the IRT: Civil Engineering. December 20, 2020. Historic American Engineering Record. 208–282 (PDF pp. 209–283). January 17, 2021. https://web.archive.org/web/20210117001227/https://tile.loc.gov/storage-services/master/pnp/habshaer/ny/ny0300/ny0387/data/ny0387data.pdf. live.
  50. Web site: Framberger. David J.. 1978. Architectural Designs for New York's First Subway. December 20, 2020. Historic American Engineering Record. 1–46 (PDF pp. 367–412). January 17, 2021. https://web.archive.org/web/20210117001227/https://tile.loc.gov/storage-services/master/pnp/habshaer/ny/ny0300/ny0387/data/ny0387data.pdf. live.
  51. News: Diehl . Lorraine B. . August 6, 2000 . Metropolitan Masterpieces; Great Artwork is as Close as the Nearest Subway Station . 2 . New York Daily News . 2692-1251 . .
  52. Web site: Artemis, Acrobats, Divas and Dancers . June 14, 2023 . Metropolitan Transportation Authority.
  53. Web site: 2015. MTA Neighborhood Maps: Upper West Side. December 30, 2016. mta.info. Metropolitan Transportation Authority. May 18, 2017. https://web.archive.org/web/20170518222150/http://web.mta.info/maps/neighborhoods/mn/M13_upper_west_side_2015.pdf. live.