Bridge Name: | Łazienki Bridge |
Carries: | Vehicles, Pedestrian, Bicycles |
Crosses: | Vistula River |
Locale: | Warsaw, Poland |
Design: | Girder bridge |
Length: | 423m (1,388feet) |
Width: | 28m (92feet) |
Traffic: | ca. 95000 (2014) |
Begin: | 1971 |
Complete: | 1974 |
Open: | 22 July 1974 |
The Łazienki Bridge (Polish: Most Łazienkowski) is a five-span steel bridge, across the Vistula in Warsaw, Poland. It is 423 m long and 28 m wide, holding three lanes for vehicles each way, dedicated cycling lanes and sidewalks for pedestrians. The name refers to the Łazienki Park and Łazienki Palace, which are located to the south-west of the bridge.
The bridge was opened along with the Łazienkowska Thoroughfare on 22 July 1974, after three years' construction. At the bridgeheads interchanges were constructed with the Wisłostrada on the left bank and Wał Miedzyszyński on the right one.
Between 1981 and 1998 the bridge was formally named (English: General [[Zygmunt Berling]] Łazienki Bridge) in honor of a Polish military commander who collaborated with the Soviets during World War II, but in practice, this name was almost never used. On a lawn underneath an entrance ramp on north-eastern side of the bridge a monument to the communist collaborator was unveiled in 1985, finally torn down in 2019 and transferred to the Museum of Polish History.
Between 2002 and 2014 the ramps connecting the bridge to the streets along both banks of the river had to be all gradually replaced due to their poor technical condition.
Below the street level, the bridge has a service corridor, mainly for inspection, but also housing certain installations: medium voltage electricity, telecommunication fiber-optics, etc. Since its construction, this corridor had a wooden floor. Due to safety concerns, it was decided to replace all wood and other flammable materials with non-flammable ones. Ironically, on 14 February 2015, during replacement works when a protective layer of asbestos was already removed, a fire broke out on the eastern bank, under the bridge where the dismantled materials were temporarily stored. The flames reached the bridge and set fire on yet-to-be-dismantled elements. Initially it was expected that the fire should not cause serious damage, however, post-fire examination revealed that the flame temperature reached 1000 °C and damaged the steel load-bearing elements enough that the bridge required a serious refurbishment, which cost 104 million złoty (about €25 million). It was reopened to the public on 20 October 2015.
In 2017 two gangways were constructed underneath the sides of the bridge dedicated for cyclists and pedestrians, improving traffic safety by separating cyclists from vehicular traffic and providing convenient access to the bridge from the esplanades on the banks of the Vistula river.