Øresund Bridge Explained

Bridge Name:Øresund Bridge
Öresund Bridge
Official Name:Øresundsbron (used by company), Øresundsbroen (Danish), Öresundsbron (Swedish)
Carries:Four lanes of European route E20
Double-track Øresund Line
Crosses:Øresund strait (the Sound)
Locale:Copenhagen, Denmark, and Malmö, Sweden
Designer:Jørgen Nissen, Klaus Falbe Hansen, Niels Gimsing and Georg Rotne
Builder:Hochtief, Skanska, Højgaard & Schultz and Monberg & Thorsen
Design:Cable-stayed bridge
Engineering:Ove Arup & Partners
Setec
ISC
Gimsing & Madsen
Mainspan:490m (1,610feet)
Length:7845m (25,738feet)
Width:23.5m (77.1feet)
Height:204m (669feet)
Below:57m (187feet)
Traffic: c. 18,434 road vehicles (2022) [1]
Cost:19.6 billion DKK
25.8 billion SEK
2.6 billion EUR
Begin:1995
Complete:1999
Open:1 July 2000
Toll:Until 31 December 2023: DKK 440, SEK 650 or EUR 59
From 1 January 2024: DKK 455, SEK 673 or EUR 61 [2]
Mapframe-Zoom:10
Coordinates:55.5753°N 12.8269°W
References:[3] [4] [5]

The Øresund or Öresund Bridge[6] is a combined railway and motorway cable-stayed bridge across the Øresund strait between Denmark and Sweden. It is the second longest bridge in Europe with both roadway and railway combined in a single structure, running nearly 80NaN0 from the Swedish coast to the artificial island Peberholm in the middle of the strait. The crossing is completed by the 4km (02miles) Drogden Tunnel from Peberholm to the Danish island of Amager.

The bridge connects the road and rail networks of the Scandinavian Peninsula with those of Central and Western Europe. A data cable also makes the bridge the backbone of Internet data transmission between central Europe and Sweden.[7] The international European route E20 crosses via road, the Øresund Line via railway. The construction of the Great Belt Fixed Link (1988–1998), connecting Zealand to Funen and thence to the Jutland Peninsula, and the Øresund Bridge have connected Central and Western Europe to Sweden by road and rail.

The bridge was designed by Jørgen Nissen and Klaus Falbe Hansen from Ove Arup and Partners, and Niels Gimsing and Georg Rotne.[8]

The justification for the additional expenditure and complexity related to digging a tunnel for part of the way, rather than raising that section of the bridge, was to avoid interfering with air traffic from the nearby Copenhagen Airport, to provide a clear channel for ships in good weather or bad, and to prevent ice floes from blocking the strait. Construction began in 1995, with the bridge opening to traffic on 1 July 2000. The bridge received the 2002 IABSE Outstanding Structure Award.

History

Ideas for a fixed link across the Øresund were advanced as early as the first decade of the 20th century. In 1910, proposals were put to the Swedish Parliament for a railway tunnel across the strait, which would have comprised two tunnelled sections linked by a surface road across the island of Saltholm.[9] The concept of a bridge over the Øresund was first formally proposed in 1936 by a consortium of engineering firms who proposed a national motorway network for Denmark.[10] [11]

The idea was dropped during World War II, but picked up again thereafter and studied in significant detail in various Danish-Swedish government commissions through the 1950s and 1960s.[10] However, disagreement existed regarding the placement and exact form of the link, with some arguing for a link at the narrowest point of the sound at HelsingørHelsingborg, further north of Copenhagen, and some arguing for a more direct link from Copenhagen to Malmö. Additionally, some regional and local interests argued that other bridge and road projects, notably the then-unbuilt Great Belt Fixed Link, should take priority.[10] The governments of Denmark and Sweden eventually signed an agreement to build a fixed link in 1973.[12] It would have comprised a bridge between Malmö and Saltholm, with a tunnel linking Saltholm to Copenhagen, and would have been accompanied by a second rail tunnel across the Øresund between Helsingør and Helsingborg.[13]

However, that project was cancelled in 1978 due to the economic situation,[14] and growing environmental concerns.[15] As the economic situation improved in the 1980s, interest resumed and the governments signed a new agreement in 1991.

An OMEGA centre report identified the following as primary motivations for construction of the bridge:[15]

A joint venture of Hochtief, Skanska, Højgaard & Schultz and Monberg & Thorsen (the same of the previous Great Belt Fixed Link), began construction of the bridge in 1995 and completed it 14 August 1999.[16] Crown Prince Frederik of Denmark and Crown Princess Victoria of Sweden met midway across the bridge-tunnel on 14 August 1999 to celebrate its completion.[17] The official dedication took place on 1 July 2000, with Queen Margrethe II of Denmark and King Carl XVI Gustaf of Sweden as the hostess and host of the ceremony.[18] Because of the death of nine people, including three Danes and three Swedes, at the Roskilde Festival the evening before, the ceremony opened with a minute of silence.[19] The bridge-tunnel opened for public traffic later that day. On 12 June 2000, two weeks before the dedication, 79,871 runners competed in Broloppet, a half marathon from Amager, Denmark, to Skåne, Sweden.[20]

Despite two schedule setbacks – the discovery of 16 unexploded World War II bombs on the seafloor and an inadvertently skewed tunnel segment – the bridge-tunnel was finished three months ahead of schedule.

Although traffic between Denmark and Sweden increased by 61 percent in the first year after the bridge opened, traffic levels were not as high as expected, perhaps due to high tolls.[21] However, since 2005, traffic levels have increased rapidly. This may be due to Danes buying homes in Sweden to take advantage of lower housing prices in Malmö and commuting to work in Denmark. In 2012, to cross by car cost DKK 310, SEK 375 or 43, with discounts of up to 75% available to regular users. In 2007, almost 25 million people travelled over the Øresund Bridge: 15.2 million by car and bus and 9.6 million by train. By 2009, the figure had risen to 35.6 million by car, coach or train.[22] [23]

Link features

Bridge

At 7.85km (04.88miles), the bridge covers half the distance between Sweden and the Danish island of Amager, the border between the two countries being 5.31NaN1 from the Swedish end. The structure has a mass of 82,000 tonnes and supports two railway tracks beneath four road lanes in a horizontal girder extending along the entire length of the bridge. On both approaches to the three cable-stayed bridge sections, the girder is supported every 1400NaN0 by concrete piers. The two pairs of free-standing cable-supporting towers are 2040NaN0 high allowing shipping 570NaN0 of head room under the main span, but most ships' captains prefer to pass through the unobstructed Drogden Strait above the Drogden Tunnel. The cable-stayed main span is 4910NaN0 long. A girder and cable-stayed design was chosen to provide the specific rigidity necessary to carry heavy rail traffic, and also to resist large accumulations of ice.The bridge experiences occasional brief closures during very severe weather, such as the St. Jude storm of October 2013.[24]

Due to high longitudinal and transverse loads acting over the bridge and to accommodate movements between the superstructure and substructure, it has bearings weighing up to each, capable of bearing vertical loads up to 96000kN in a longitudinal direction and up to 40000kN in transverse direction. The design, manufacturing and installation of the bearings were carried out by the Swiss civil engineering firm Mageba.[25]

Vibration issues, caused by several cables in the bridge moving under certain wind and temperature conditions, were combatted with the installation of compression spring dampers installed in pairs at the centre of the cables. Two of these dampers were equipped with laser gauges for ongoing monitoring. Testing, development and installation of these spring dampers was carried out by specialists European Springs.[26]

Peberholm

See main article: Peberholm. The bridge joins Drogden tunnel on the artificial island of Peberholm (Pepper Islet). The Danes chose the name to complement the natural island of Saltholm (Salt Islet) just to the north. Peberholm is a designated nature reserve built from Swedish rock and the soil dredged up during the bridge and tunnel construction, approximately 41NaN1 long with an average width of 5000NaN0. It is 20m (70feet) high.

Drogden Tunnel

The connection between Peberholm and the artificial peninsula at Kastrup on Amager island, the nearest populated part of Denmark, is through the 4.05km (02.52miles) long Drogden Tunnel (Drogdentunnelen). It comprises a 3.51km (02.18miles) immersed tube plus 2700NaN0 entry tunnels at each end. The tube tunnel is made from 20 prefabricated reinforced concrete segments – the largest in the world at 55,000 tonnes each – interconnected in a trench dug in the seabed. Two tubes in the tunnel carry railway tracks, two carry roads and a small fifth tube is provided for emergencies. The tubes are arranged side by side.

Rail transport

See main article: Øresund Line. The rail link is operated jointly by the Swedish Transport Administration (Trafikverket) and the Danish railway infrastructure manager Banedanmark. Passenger train service is commissioned by Skånetrafiken and the Danish Civil Aviation and Railway Authority (Trafikstyrelsen) under the Øresundståg brand, with Transdev and DSB being the current operators.[27] A series of new dual-voltage trains was developed, linking the Copenhagen area with Malmö and southern Sweden as far as Gothenburg and Kalmar. SJ operates X2000 trains over the bridge, with connections to Gothenburg and Stockholm. Copenhagen Airport at Kastrup has its own railway station close to the western bridgehead. Since December 2022, trains operate typically every 15 minutes during the day, reducing to once an hour during the night in both directions. Additional Øresundstrains are operated at rush hour. Freight trains also use the crossing.

The rail section is double track and capable of speeds of up to 200km/h, but slower in Denmark, especially in the tunnel section. There were challenges related to the difference in electrification and signalling between the Danish and Swedish railway networks. The solution chosen is to switch the electrical system from Swedish 15 kV, 16.7 Hz to Danish 25 kV, 50 Hz before the eastern bridgehead at Lernacken in Sweden. The line is signalled according to the standard Swedish system across the length of the bridge. On Peberholm the line switches to Danish signalling, which continues into the tunnel. There is no way of changing between a locomotive for Danish standard and one for Swedish standard. All rail vehicles using the bridge must be custom made for the standards of both countries.

Trains run on the left in Sweden, and on the right in Denmark. Initially the switch was made at Malmö Central Station, a terminus at that time. After the 2010 inauguration of the Malmö City Tunnel connection, a tunnel was built at Burlöv, north of Malmö, where the two southbound tracks cross over the northbound pair. The railway in Malmö thus uses the Danish standard.

Border checks

With both Sweden and Denmark being part of the Nordic Passport Union since the 1950s, border controls between the two countries have been abolished for decades and travellers can normally move freely across the Øresund Bridge. In 2001, both countries also joined the Schengen area, and since then the abolition of border controls is primarily regulated by European Union law, more specifically the Schengen acquis.

However, in November 2015, during the European migrant crisis, Sweden introduced temporary border controls at the border to Denmark in accordance with the provisions of the Schengen acquis on the reintroduction of temporary internal border controls. As such, travellers into Sweden from Denmark (but not travellers into Denmark from Sweden) must show a valid passport or national ID card (citizens of EU/EEA countries) or passport and entry visa (if required) for nationals of other non-EU/EEA countries. The move marked a break with 60 years of border control free travel between the Nordic countries.[28] In January 2016, these border measures were extended by a special carriers' liability, forcing carriers (such as bus, train and ferry companies) to check the identity of all passengers from Denmark before they boarded a bus, train or ferry to Sweden. These checks were enforced by a fine of SEK 50,000 as punishment for serving those without such identity documents.[29] This led to the enforcement of checks by private security guards at, for instance, the rail station in Kastrup airport in Denmark, an unpopular move with passengers, due to the delays imposed.[30]

In May 2017, Sweden removed the carriers' liability, but the ordinary border controls carried out by the Swedish Police Authority remained on the Swedish side of the Øresund Bridge.[31] In accordance with the Schengen Borders Code, these border controls are only allowed for a period of six months at a time, and therefore have to be renewed twice a year.[32]

Costs and benefits

The cost for the Øresund Connection, including motorway and railway connections on land, was DKK 30.1 billion (~€4.0 billion) according to the 2000 year price index, with the cost of the bridge expected in 2003 to be recouped by 2037.[33]

In 2006, Sweden began work on the Malmö City Tunnel, a SEK 9.45 billion connection with the bridge that was completed in December 2010. The connection will be entirely user-financed. The owner company is owned half by the Danish state and half by the Swedish state. This owner company has taken loans guaranteed by the governments to finance the connection and the user fees are its only income. After the increase in traffic, these fees are enough to pay the interest and begin repaying the loans, which is expected to take about 30 years.

Taxpayers have paid for neither the bridge nor the tunnel, but tax money has been used for the land connections. On the Danish side, the land connection has domestic benefits, mainly to connect the airport to the railway network. The Malmö City Tunnel has the benefit of connecting the southern part of the inner city to the rail network and allowing many more trains to and from Malmö.

According to The Öresund Committee, the bridge has made a national economic gain of DKK 57 billion, or SEK 78 billion SEK (~€8.41 billion) on both sides of the strait by increased commuting and lower commuting expense.[34] The gain is estimated to be SEK 6.5 billion per year but this could be increased to 7.7 billion by removing the three biggest obstacles to integration and mobility, the two largest being that non-EU nationals in Sweden are not allowed to work in Denmark and that many professional qualifications and merits are not mutually recognised.[35]

A 2021 study found that the bridge led to an increase in innovation in Malmö. The key mechanism appears to be that high-skilled workers were drawn to Malmö.[36] A 2022 study found that the bridge caused an increase of 13.5% in the average wage of workers in the region, as the bridge expanded the size of the labor market.[37]

Cultural references

Environmental effects

The underwater parts of the bridge have become covered in marine organisms and act as an artificial reef.[40] [41]

See also

External links

Notes and References

  1. Web site: ØRESUND 2023 REPORT . Øresundsbron . 22 December 2023.
  2. Web site: Øresund Bridge Pricing - DKK . Øresundsbron . 22 December 2023.
  3. Web site: Statistik & Rapporter . Øresundsbron . 2024-05-28 . https://web.archive.org/web/20240531113904/https://www.oresundsbron.com/sv/om-oresundsbron/statistik-och-rapporter . 2024-05-31 . live . sv . 2024-05-31.
  4. Web site: Öresundsbron, Malmö . skanska.se . 2024-05-31 . https://web.archive.org/web/20240531114820/https://www.skanska.se/vart-erbjudande/vara-projekt/57321/Oresundsbron,-Malmo . 2024-05-31 . live . sv . 2024-05-31.
  5. Web site: Öresundsbron har fortfarande en outnyttjad potential . Nordiskt samarbete . 2021-07-05 . sv . 2024-05-31.
  6. (Danish: Øresundsbroen in Danish pronounced as /ˈøːɐsɔnsˌpʁoˀn̩/; Swedish: Öresundsbron in Swedish pronounced as /œrɛˈsɵ̂nːdsˌbruːn/; hybrid name: Øresundsbron)
  7. News: New Baltic data cable plan unfolding. 11 December 2013. 12 December 2013. Yle yhtiönä. According to current plans, the undersea optic fibre cable would run directly from Germany to Finland. Haavisto said that the project could make Finland a significant international data hub. So far, all data transmission to Finland has taken place via the Øresund Bridge, that is through Denmark and Sweden.. https://web.archive.org/web/20131214065729/http://yle.fi/uutiset/new_baltic_data_cable_plan_unfolding/6979957. 14 December 2013. live.
  8. Book: https://structurae.net/en/literature/conference-paper/getting-the-balance-right-the-oresund-bridge-design-concept . Getting the balance right. The Øresund Bridge - Design . Jørgen Nissen . Georg Rotne . Getting the balance right. The Øresund Bridge - Design concept . structurae.net . 1999 . 417–426 . 10.5169/seals-62105 .
  9. "A Submarine Military Tunnel". Scientific American, 6 August 1910, p. 104
  10. Ph.D. . Boge . Knut . 2006 . Votes Count but the Number of Seats Decides: A comparative historical case study of 20th century Danish, Swedish and Norwegian road policy. . DBI Norwegian School of Management . 11 January 2016.
  11. Marstrand. Wilhelm. Det Store Vej - og broprojekt Motorveje med broer over storebælt og Øresund. Ingeniøren. 14 March 1936. da. 67–70. The Great Road and Bridge Project Motorway with Bridge over the Great Belt and Øresund. 20 November 2015. https://web.archive.org/web/20150923172752/http://www.e-pages.dk/ingarkiv/4807/html5/?page=17. 23 September 2015. live.
  12. Book: OECD. OECD Territorial Reviews OECD Territorial Reviews: Oresund, Denmark/Sweden 2003. 2003. OECD Publishing. 978-9264100800. 77. 18 November 2015. https://web.archive.org/web/20151119150657/https://books.google.co.uk/books?id=K3Vu8FHavKgC&pg=PA77. 19 November 2015. live.
  13. Defense Transportation Journal, Vol. 29, No. 6 (November/December, 1973), p. 7
  14. Book: Krokeborg. J. Strait crossings 2001: proceedings of the Fourth Symposium on Strait Crossings, Bergen, Norway, 2 - 5 September 2001. 1 January 2001. CRC Press. Lisse. 978-9026518454. 18 November 2015. https://web.archive.org/web/20151119153058/https://books.google.co.uk/books?id=mGNcGfH33EoC&pg=PA657. 19 November 2015. live.
  15. Centre for Mega Projects in Transport and Development. Project Profile: Sweden, The Oresund Link. OMEGA Case Studies. 2014. 16 January 2016. omega. https://web.archive.org/web/20160131135458/http://www.omegacentre.bartlett.ucl.ac.uk/wp-content/uploads/2014/12/SWEDEN_ORESUND_PROFILE.pdf. 31 January 2016. live.
  16. Web site: HOCHTIEF Infrastructure Scandinavia. HOCHTIEF. 20 November 2015. https://web.archive.org/web/20151121015350/http://www.hochtief-solutions.com/solutions_en/106.jhtml. 21 November 2015. live.
  17. News: Danmark og Sverige landfast . . da . 20 November 2015 . Denmark and Sweden by Land.
  18. News: Øresundsbroen indviet . . . da . 1 July 2000 . 20 November 2015 . Oresund Bridge inaugurated . https://web.archive.org/web/20150924051009/http://www.bt.dk/nyheder/oeresundsbroen-indviet . 24 September 2015 . live .
  19. News: Broåbning i tragediens skygge . Ritzau . . da . 1 July 2000 . 20 November 2015 . https://web.archive.org/web/20150923231021/http://www.b.dk/danmark/broaabning-i-tragediens-skygge . 23 September 2015 . live .
  20. News: 90.000 løbere over Øresundsbroen . Ritzau . . da . 12 June 2000 . 26 March 2011 . 90,000 runners cross the Øresunds Bridge . https://web.archive.org/web/20120322071320/http://www.bt.dk/nyheder/90.000-loebere-over-oeresundsbroen . 22 March 2012 . live .
  21. Web site: Claus F.. Baunkjær. Cautious traffic assumptions for the Fehmarnbelt project. Fehmarn Belt Fixed Link. 28 March 2013. 20 November 2015. https://web.archive.org/web/20150702184331/http://www.femern.com/service-menu/press--documents/press-releases/cautious-traffic-assumptions-for-the-fehmarnbelt-project. 2 July 2015. dead.
  22. Web site: Øresundsbrons bokslut för 2008: Bättre resultat trots den ekonomiska avmattningen. sv. Øresundsbrons financial statements for 2008: better results despite the economic slowdown. Uk.oresundsbron.com . 24 March 2013. https://web.archive.org/web/20130313040245/http://uk.oresundsbron.com/page/34. 13 March 2013.
  23. Web site: Traffic numbers. https://web.archive.org/web/20131019074049/http://dk.oresundsbron.com/page/1216. 19 October 2013., Web site: Øresundsbron traffic figures all years. 6 October 2013. https://web.archive.org/web/20140102191148/http://dk.oresundsbron.com/page/elements/trafficnumbers/excel.php?year=all. 2 January 2014.
  24. News: Stormen lukker Øresundsbroen . . da . 28 October 2013 . 20 November 2015 . Storm closes the Øresund Bridge . https://web.archive.org/web/20151121044131/http://www.jv.dk/artikel/1632666:Indland--Stormen-lukker-Oeresundsbroen . 21 November 2015 . live .
  25. Web site: Øresund Bridge . Mageba . 22 December 2016 . https://web.archive.org/web/20161223131629/http://www.mageba.ch/en/804/References.htm?Reference=19554 . 23 December 2016 . live .
  26. Web site: The Öresund bridge. European Springs and Pressings . 20 November 2015. https://web.archive.org/web/20151121052036/http://www.europeansprings.com/spring-manufacturer/oresund-bridge.asp. 21 November 2015.
  27. Web site: About Us. www.oresundstag.se. 14 October 2021.
  28. News: Kirk. Lisbeth. Domino effect: Denmark follows Sweden on EU border checks. 7 January 2016. EUObserver. 5 January 2016. https://web.archive.org/web/20160125111827/https://euobserver.com/beyond-brussels/131702. 25 January 2016. live.
  29. News: Migrant crisis: Sweden border checks come into force. 4 January 2016. BBC News. 4 January 2016. https://web.archive.org/web/20160104043415/http://www.bbc.co.uk/news/world-europe-35218921. 4 January 2016. live.
  30. Web site: Sweden border checks to extend into Denmark . thelocal.se . 7 December 2015 .
  31. News: Sweden ends ID checks for travellers from Denmark - Radio Sweden. Sveriges. Radio. Sveriges Radio. 2 May 2017.
  32. Web site: Temporary Reintroduction of Border Control. 6 December 2016. Migration and Home Affairs - European Commission.
  33. Book: OECD Territorial Reviews OECD Territorial Reviews: Oresund, Denmark/Sweden 2003 OECD Territorial Reviews Series. OECD. OECD Publishing. 2003. 978-92-64-10080-0. 38.
  34. Book: Ekonomiska vinster av Øresundsförbindelsen. Öresund Institute. November 2014. 20 November 2015. sv. https://web.archive.org/web/20150924061526/http://www.oresundskomiteen.org/wp-content/uploads/2012/11/Oi_Analyse_Vinster_av_Oresundsforbindelsen.pdf. 24 September 2015. live.
  35. News: Öresundsbron ger mångmiljardvinster. Dagens Nyheter. Stockholm. 31 August 2014. Oresund Bridge provides multi-billion profits. 20 November 2015. Thomas. Hamberg. https://web.archive.org/web/20150924082409/http://www.dn.se/ekonomi/oresundsbron-ger-mangmiljardvinster/. 24 September 2015. live.
  36. Ejermo. Olof. Hussinger. Katrin. Kalash. Basheer. Schubert. Torben. 2021. Innovation in Malmö after the Öresund Bridge. Journal of Regional Science. 62. 5–20. en. 10.1111/jors.12543. 1467-9787. free.
  37. Bütikofer . Aline . Løken . Katrine V. . Willén . Alexander . 2022-11-03 . Building Bridges and Widening Gaps . The Review of Economics and Statistics . 106 . 3 . 681–697 . 10.1162/rest_a_01183 . 228161315 . 0034-6535.
  38. Web site: Mord på Öresundsbron i ny tv-serie . SvD.se . 2011-09-16 . https://web.archive.org/web/20240531115324/https://www.svd.se/a/356735dc-16f3-34f3-93fc-8741ddb68d15/mord-pa-oresundsbron-i-ny-tv-serie . 2024-05-31 . live . sv . 2024-05-31.
  39. Web site: The Quietus | Features | A Quietus Interview | Bleeding Edge: Nicky Wire on Futures, Futurism and Futurology. The Quietus.
  40. Web site: Trots farhågorna – här frodas undervattenslivet vid vindkraftverken i Öresund . . 2023-05-21 . sv . 2024-05-31. När Öresundsbron skulle byggas oroades många över att bropelarna skulle störa det marina livet. Så blev det inte – tvärtom. Nu ser dykarna samma utveckling när det gäller den havsbaserade vindkraften. Vi har sett massor av liv och kan likställa det med ett konstgjort rev, säger Erik Skog, ordförande i föreningen..
  41. Web site: Öresundsbron, Malmö . . 2024-05-31 . https://web.archive.org/web/20240531114820/https://www.skanska.se/vart-erbjudande/vara-projekt/57321/Oresundsbron,-Malmo . 2024-05-31 . live . sv . 2024-05-31. Men Öresundsbron har visat sig vara bra för miljön. Bropelarna suger åt sig organismer som annars hade haft svårt att hitta någon annanstans att leva. På bropelarna lever exempelvis upp till 140 000 musslor per kvadratmeter. Musslor som i sin tur blir föda åt exempelvis torsken..